Royal Mail Distribution Centre

Project Location

Medway

Main Contractor

Sisk Building Construction

Project Background

A new £14 million, 15,400 square metre construction of a Royal Mail Distribution Centre located on a 5.4 hectare site at the edge of strood town centre. When completed the site will process over 3 million mail items per day. The environmentally sustainable building is due for completion in May 2012. The site has been carefully designed to optimise the flow of incoming and outgoing lorrys and vans so as not to distrupt the flow of general staff/site traffic.

Application

To seal 5000m approximately of the below type of joints:

External – 16mm to 30mm wide concrete paving slabs subject to high heavy goods vehicle traffic.

Internal – 6-10mm saw cut joints inside the distribution centre.

Royal Mail Distribution Centre Royal Mail Distribution Centre Royal Mail Distribution Centre Royal Mail Distribution Centre Royal Mail Distribution Centre

Click images to enlarge

Project Start Date

October 2011

Project Completion Date

May 2012